AI INFRASTRUCTURE LIQUID COOLING
A free webinar from Apex + Dow
Cool From Day 1Getting Glycol Startup
& Commissioning Right
A practical look at preparing, filling and verifying glycol cooling loops for a clean, documented and accepted startup.
WHY STARTUP MATTERS
Small fluid problems can become big project problems.
Trapped water, construction debris or cleaning residue in the FWS/ FCS and TCS cooling loops can delay acceptance, require corrective flushing or put a new system at risk.
In this session, Apex and Dow connect cooling system preparation and fluid chemistry to the decisions that support a clean, documented and accepted startup. Explore what each stage needs to establish before the next team takes over.
PRACTICAL BEST PRACTICES + LESSONS LEARNED
What you’ll learn
Clear questions to ask.
Useful evidence to look for.
Recognize startup risks
Six fluid and system conditions that can lead to rework or delay.
Coordinate startup and handoffs
A six-stage process with separate loop requirements, clear decision owners, usable records and waste planning.
Account for retained water
How retained water can dilute a correctly supplied glycol charge and its inhibitor package.
Put water quality and filtration in context
DOWFROSTâ„¢ LC 25 and HD flushing-water checkpoints and OCP filtration examples, with requirements tied to the system and startup stage.
Plan sampling and testing
When to establish the final-fluid baseline, how often to test afterward, and which system changes trigger additional sampling.
Ask better turnover questions
Five questions to connect accepted results, operating readiness and clear ownership.
FIELD EXPERIENCE MEETS FLUID SCIENCE
Meet your presenters
Brett Robison
Director of Corporate Accounts
Brett works with AI infrastructure owners and operators, contractors and equipment partners on liquid cooling and long-term cooling reliability.
Lauren Huffman, Ph.D.
Senior Technical Service & Development Scientist
Lauren focuses on technical service for cooling fluids used in AI infrastructure and holds a Ph.D. in organic chemistry from the University of Wisconsin.
BUILT FOR THE PROJECT TEAM
Is this session for you?
For AI infrastructure owners and operators, developers, EPC firms, commissioning agents, mechanical contractors, engineers and facility managers responsible for liquid cooling design, build, startup, commissioning, and long-term operations.
How technical is the session?
Expect practical guidance on what to check, why it matters, and what evidence to request before startup and turnover. Selected technical examples will help you spot readiness gaps and ask better questions to reduce the risk of rework and delays.
Field procedures and acceptance limits must follow approved project and equipment manufacturer requirements. For detailed, step-by-step onsite execution guidance and SOP support, please contact Apex.
Will there be a live Q&A?
Yes. Bring questions about your loop, exact fluid or project stage so the presenters can put the discussion in context.
Can I get supporting materials?
Detailed specifications and supporting materials can be shared after the webinar if needed.
A BETTER START FOR LIQUID COOLING